References

  1. Clutterbuck JR 1996 Geological Report. Birnin Gwari Gold Deposit, Nigeria. ADMS Report for Quilos International.
  2. Hawkins TG & Coates J 1999. Review and valuation on selected Nigerian permits for Columbia River Resources. CME & Company.
  3. Gabako D 2007 Report on EcoPhoenix Limited Shaft Sampling Programme at Birnin Gwari (February 2006) EcoPhoenix Internal Report
  4. Willan RCR 2008 Summary of exploration work carried out for EcoPhoenix (Nigeria) Ltd on the Birnin Gwari Gold Prospect, Kaduna State,     Nigeria, Oct – Dec 20 2007 CSA Global Pty Ltd Report Ref CI 359
  5. Dominy SC & Annels AE 2000 General considerations of sampling and assaying in Johansen GF & Cuffley BW a coarse gold environment. Trans Int Min Metall (Sect B: Appl Earth Sci) 109 September-December 2000.
  6. Mackay RA & Beer KE 1952 The Albite-Riebeckite-Granites of Nigeria Report GSM/AED 95Geological Survey & Museum Atomic Energy Division Department of Scientific and Industrial Research, UK.
  7. Chubb A 2009 Information Memorandum: EcoPhoenix Ltd Exploration Project Investment Opportunities in Nigeria. CSA Global Pty Ltd Report
  8. AFROL News 2008 Nigeria goes for nuclear power

http://www.afrol.com/articles/26216

Acknowledgements

Geological Map, 1974 Federal Survey, Lagos, Nigeria (Gold project highlights)
VTEM anomoly map and image, Geotech Ltd, Canada (Base metals and silver projects Nahuta licences 1, 2 and 3)